2025 Bond Projects Home
Our Why

That’s our why at Goodrich Area Schools - and it’s the reason we are so grateful for the community’s support in approving the November 2025 Bond. This bond is a commitment to the future of our children and the strength of our community. Together, we said yes to learning environments that match the potential of our students and opportunities that prepare them for life after graduation.
We believe our students deserve safe, modern, and engaging spaces where they can learn, grow, explore their interests, and discover their paths. From updated classrooms and critical infrastructure improvements to expanded learning opportunities and spaces designed for collaboration, this investment ensures our schools keep pace with the needs of today’s learners and tomorrow’s workforce.
Strong schools build strong communities. The approval of this bond reflects what makes Goodrich special. Thank you for your trust, your support, and your belief in our vision. Together, we are building a stronger future for Goodrich students and our entire community.
Stadium Turf Installation - 6/10/26
2025 Bond Planned Bond Projects

2020 Completed Bond Projects
The passing of the $19.2 million dollar Bond Millage in 2020 allowed us to address critical infrastructure needs and laid the groundwork for the future renovation and transformation of our district programs and spaces. The centerpiece of the bond was our Oaktree Gymnasium addition. This gave our growing Grades 2-5 student population a space dedicated to physical education but also freed up the cafetorium for lunch. The redesign of our highly popular Makerspaces, Innovation Lab and Martian Union allowed staff and students the opportunity to pilot furniture and programming for future Bond projects.
-
DISTRICT-WIDE PROJECTS
The following projects were completed at every district building and the Bus Garage, if applicable.
2020-2021
Wireless Access upgrade, district-wide
Phone system, server, handsets replaced; E911 location capability added2021-2022
Classroom teaching wall upgrades (interactive panel & classroom sound system)
Chromebook tablets for teaching staff
Digital public address system & clock replacement
Phone system and phone server upgrade
Classroom door lockset replacement
Water Quality upgrades - Bottle Filling stations replacing all drinking fountains
AI intercoms at main building entrances and loading docks2022-2023
Security camera system replaced and expanded
Staff desktop computer stations2023-2024
External Door access control
Network switches replacement
Cafeteria AV projectors and sound system replacement - all buildings
Fiber connection to Athletic Stadium and Bus Garage; Fiber upgrade to 10 GB between buildings
-
HIGH SCHOOL
Along with the District-wide projects, the following projects were also completed at the High School campus:
2021-2022
New Stadium Fencing
9 - Classroom sets of 36 chromebooks/cart2022-2023
South Parking lot replaced
Auditorium projector replaced
Digital Signage replaced in Martian Union/Cafeteria
Media Center/Cafeteria renovated into Martian Union
Electrical System Upgrades
Tech Lab renovated
Mechanical System Upgrades
Desktop computers for Apps Lab
Desktop computers for Flex Lab
Desktop computers for Tech Lab
2 classroom sets of Sphero programmable robots
AV Broadcasting cart
AV lighting for Broadcast room
Classroom set of chromebooks for Flex Lab2023-2024
Auditorium Sound System upgrade
TouchWall Interactive Hall of Fame
Improved drainage/asphalt of Bus Drive
Band Sound Recording System
Secure Entrance at Central Office
New Transformer2024-2025
Auditorium Roof Replacement
-
MIDDLE SCHOOL
Along with the District-wide projects, the following projects were also completed at the Middle School campus:
2021-2022
Secured Office Renovation
Partial Roof replacement
Building soffitt and fascia replacement
Desktop computers for Tech Computer Lab
Desktop computers for Instructional Lab
Supplemental chrome books for Tech Computer Lab
5 - classroom sets of 36 chromebooks/cart
2022-2023
Construction of Makerspace and Video Lab
New carpet in Media Center
Desktop computers for Apps Lab
Desktop computers for Makerspace and Media Center
Two 3-D printers
AV Broadcasting cart
AV lighting for Broadcast room
2 class sets of Sphero Robots
Digital Cameras for Photography Class
Microbits programming kits
2 - Classroom sets of chromebooks carts for Flex Lab and Media Center -
OAKTREE ELEMENTARY
Along with the District-wide projects, the following projects were also completed at the Oaktree Elementary campus:
2021-2022
Construction of new gymnasium
Construction of new Makerspace Lab
Partial flat roof and roof installation replacement
Partial floor and carpet replacement
Classroom sets of 15 chrome books for each classroom
LU Interactive projector
Set of 30 chrome books for Makerspace
2022-2023
AV Projector/Sound upgrade in Cafeteria
Heating/Cooling infrastructure upgrade2023-2024
Entrance Road asphalt replacement
Sphero Programming robots
15 chrome books for Science Lab
Indi programmable cars
Microbits programming kits
Video camera for student announcements -
REID ELEMENTARY PROJECTS
Along with the District-wide projects, the following projects were also completed at the Reid Elementary campus:
2021-2022
Classroom Doors Lockset Replacement
Water Quality Upgrades - Bottle Fillers
Classroom Centers set of 6 touchscreen chromebooks
Roofing Replacement
Interior Renovations - Corridor Flooring Replacement
Design Phase of Maker Space Remodel
ActiveFloor Interactive Floor projector
Student restroom improvements2022-2023
New Electric Panel Board
Toilet Room Exhaust Upgrades
Water Quality Upgrades-Filtration
Maker Space Remodel
Video camera for announcements
Indi programmable cars
Snap Circuits2023-2024
Chromebook Cart of 30 for classroom use
STREAM lab equipment -




-



Community Survey Results
District Road Map
Bond Proposal







