Skip to main content

Goodrich Area Schools

Preparing Students for Life

2025 Bond Projects Home

Our Why

The Goodrich Spartans logo features a helmet and text.

That’s our why at Goodrich Area Schools  -  and it’s the reason we are so grateful for the community’s support in approving the November 2025 Bond. This bond is a commitment to the future of our children and the strength of our community. Together, we said yes to learning environments that match the potential of our students and opportunities that prepare them for life after graduation.

We believe our students deserve safe, modern, and engaging spaces where they can learn, grow, explore their interests, and discover their paths. From updated classrooms and critical infrastructure improvements to expanded learning opportunities and spaces designed for collaboration, this investment ensures our schools keep pace with the needs of today’s learners and tomorrow’s workforce.

Strong schools build strong communities. The approval of this bond reflects what makes Goodrich special. Thank you for your trust, your support, and your belief in our vision. Together, we are building a stronger future for Goodrich students and our entire community. 

Stadium Turf Installation - 6/10/26

2025 Bond Planned Bond Projects

  • A document titled 'Bond Proposal Information' with details about Goodrich High School.

  • A document titled 'Bond Proposal Information' with details about school improvements.

  • A flyer details a bond proposal for school improvements, including text and images.

  • A document outlines safety and security enhancements, including playground upgrades and security cameras.

  • A document outlines bond proposal information for interior and exterior renovations.

  • A document titled 'Bond Proposal Information' lists infrastructure upgrades and replacements.

  • Informational flyer detailing enhancements to arts and athletics, including new facilities and upgrades.

A modern building with an American flag flying in front.

2020 Completed Bond Projects

The passing of the $19.2 million dollar Bond Millage in 2020 allowed us to address critical infrastructure needs and laid the groundwork for the future renovation and transformation of our district programs and spaces.   The centerpiece of the bond was our Oaktree Gymnasium addition.  This gave our growing Grades 2-5 student population a space dedicated to physical education but also freed up the cafetorium for lunch.    The redesign of our highly popular Makerspaces, Innovation Lab and Martian Union allowed staff and students the opportunity to pilot furniture and programming for future Bond projects.   

Interior New OT Gym

  • DISTRICT-WIDE PROJECTS

    The following projects were completed at every district building and the Bus Garage, if applicable.

     

    2020-2021

    Wireless Access upgrade, district-wide
    Phone system, server, handsets replaced; E911 location capability added

    2021-2022

    Classroom teaching wall upgrades (interactive panel & classroom sound system)
    Chromebook tablets for teaching staff
    Digital public address system & clock replacement

    Phone system and phone server upgrade
    Classroom door lockset replacement
    Water Quality upgrades - Bottle Filling stations replacing all drinking fountains
    AI intercoms at main building entrances and loading docks

    2022-2023

    Security camera system replaced and expanded
    Staff desktop computer stations

    2023-2024

    External Door access control
    Network switches replacement
    Cafeteria AV projectors and sound system replacement - all buildings
    Fiber connection to Athletic Stadium and Bus Garage; Fiber upgrade to 10 GB between buildings

     

     

    Bar Graph of 2020 Bond Investments

  • HIGH SCHOOL

    Along with the District-wide projects, the following projects were also completed at the High School campus:

    2021-2022

    New Stadium Fencing
    9 - Classroom sets of 36 chromebooks/cart

    2022-2023

    South Parking lot replaced
    Auditorium projector replaced
    Digital Signage replaced in Martian Union/Cafeteria
    Media Center/Cafeteria renovated into Martian Union
    Electrical System Upgrades
    Tech Lab renovated
    Mechanical System Upgrades
    Desktop computers for Apps Lab
    Desktop computers for Flex Lab
    Desktop computers for Tech Lab
    2 classroom sets of Sphero programmable robots
    AV Broadcasting cart
    AV lighting for Broadcast room
    Classroom set of chromebooks for Flex Lab

    2023-2024

    Auditorium Sound System upgrade
    TouchWall Interactive Hall of Fame
    Improved drainage/asphalt of Bus Drive
    Band Sound Recording System
    Secure Entrance at Central Office
    New Transformer

    2024-2025

               Auditorium Roof Replacement

  • MIDDLE SCHOOL

    Along with the District-wide projects, the following projects were also completed at the Middle School campus:

    2021-2022

    Secured Office Renovation
    Partial Roof replacement
    Building soffitt and fascia replacement
    Desktop computers for Tech Computer Lab
    Desktop computers for Instructional Lab
    Supplemental chrome books for Tech Computer Lab
    5 - classroom sets of 36 chromebooks/cart

     

    2022-2023

    Construction of Makerspace and Video Lab
    New carpet in Media Center
    Desktop computers for Apps Lab
    Desktop computers for Makerspace and Media Center
    Two 3-D printers
    AV Broadcasting cart
    AV lighting for Broadcast room
    2 class sets of Sphero Robots
    Digital Cameras for Photography Class
    Microbits programming kits
    2 - Classroom sets of chromebooks carts for Flex Lab and Media Center

  • OAKTREE ELEMENTARY

      Along with the District-wide projects, the following projects were also completed at the Oaktree Elementary campus:

    2021-2022

    Construction of new gymnasium
    Construction of new Makerspace Lab
    Partial flat roof and roof installation replacement
    Partial floor and carpet replacement
    Classroom sets of 15 chrome books for each classroom
    LU Interactive projector
    Set of 30 chrome books for Makerspace

     

    2022-2023

    AV Projector/Sound upgrade in Cafeteria
    Heating/Cooling infrastructure upgrade

    2023-2024

    Entrance Road asphalt replacement
    Sphero Programming robots
    15 chrome books for Science Lab
    Indi programmable cars
    Microbits programming kits
    Video camera for student announcements

  • REID ELEMENTARY PROJECTS

    Along with the District-wide projects, the following projects were also completed at the Reid Elementary campus:

    2021-2022

    Classroom Doors Lockset Replacement
    Water Quality Upgrades - Bottle Fillers
    Classroom Centers set of 6 touchscreen chromebooks
    Roofing Replacement
    Interior Renovations - Corridor Flooring Replacement
    Design Phase of Maker Space Remodel
    ActiveFloor Interactive Floor projector
    Student restroom improvements

    2022-2023

    New Electric Panel Board
    Toilet Room Exhaust Upgrades
    Water Quality Upgrades-Filtration
    Maker Space Remodel
    Video camera for announcements
    Indi programmable cars
    Snap Circuits

    2023-2024

    Chromebook Cart of 30 for classroom use
    STREAM lab equipment

  • HS Roof Replacement diagram

    MS Roof Replacement diagram

    OT Roof Replacement diagram

    RD Roof Replacement diagram

  • HS Pavement Replacement diagram

    OT/MS Pavement Replacement diagram

    Reid Pavement Replacement diagram

HAVE QUESTIONS?

If you have questions on the bond process or proposed projects, please contact: 

Mr. Mike Baszler

Superintendent of Goodrich Area Schools,ツ (810) 591-2250.